The Pinnacle Estate Stage 1, Dapto

empty

The Pinnacle Estate Stage 1, Dapto

empty

Address not specified

Status:

Complete

Project Manager:

Cameron Johnson

Contact Email:

csjohnson@kfw.net.au

thumbnail
thumbnail
thumbnail
thumbnail

The Pinnacle Estate Stage 1, Dapto

In September 2010 KFW Surveyors completed civil and cadastral survey works for Stage 1 of The Pinnacle Estate in Dapto. The development provided a number of challenges that were required to be overcome by the lead design and project management consultant Cardno Forbes Rigby. In particular, issues regarding to environmental heritage, bushfire and stormwater drainage were of note. By being the sole contractor for all civil and cadastral surveying we were able to work closely with Cardno and civil constructor (Glennos Constructions) to develop solutions to these issues. A real triumph of the project has been the integration of sustainable drainage solutions that maintain and control the flow of stormwater to an already low lying catchment. In this regard, our surveyors were directly responsible for setout and design adjustments, in consultation with the engineers, for underground drainage infrastructure and detention ponds.

From a cadastral perspective, a combined GPS and total station approch was utilised to redetermine boundaries that had remained unsurveyed since the 1960's. Beyond this our involvement to assist in the production of a complex 88B instrument for some 20 easements and restrictions ensured the development was delivered efficiently to the market.

The construction of the next stage will be commencing throughout 2011.

empty
resource icon

The Pinnacle Estate  1.547 MB

Sales Plan

empty